I was given information about a book titled "Photographs of work of the 157th Engineer Combat Battalion" and after several emails, and a lot of waiting, I was able to track it down! I knew the book was 1000 miles away from where I live so I asked if I could see it via an inter-library loan but I was told I could not due to the fragile condition of the book. Fortunately, they were happy to scan the book for me and send me a digital copy! While I prefer to do my own scanning, they did a good job and last night I received the first of likely three installments.
This first batch was 25 pages long and had approximately 39 photographs and needless to say, I have poured over them! The photographs do not appear to be in chronological order and the labels, which seem to have been an afterthought, that were included in the book do not give the best information. I added dates and additional information where I could and I hope to find the information for the other photographs soon.
The first pages were labeled "Putting extra transoms on bridge to strengthen to Class 70" These are from the Seine RIver Bridge at Mantes Glassicourt, Fance. There is a lot written about this bridge as it was the first time that a Bailey Bridges was used in this way: four river barges were used to support the Bailey Bridge. One of the gentlemen, T/5 Richard Purcell, who was in Company C with my grandfather said that the night before the work began on the bridge, Company C unloaded 29 truckloads of Bailey Bridge. After finishing unloading in the early morning, Mr. Purcell was told to get some chow and some sleep. He opted for the sleep but as soon as he laid down, he was told to get up as it was time to start the construction of the bridge. Mr. Purcell has some great stories about this bridge, partly due to the fact that his birthday is August 21st, the same day construction of the bridge began.
This is also where my Grandfather was shot through the leg by the straffing ME-109s, temporarily taking him out of the war. I understand in talking with another 157th, Company C soldier, Sgt. Alton Heimbach, that my Grandfather helped to bring the barges down to the bridge site.
Putting extra transoms on bridge to strengthen to Class 70 (1 of 5)
Putting extra transoms on bridge to strengthen to Class 70 (2 of 5)
Putting extra transoms on bridge to strengthen to Class 70 (3 of 5)
Putting extra transoms on bridge to strengthen to Class 70 (4 of 5)
Putting extra transoms on bridge to strengthen to Class 70 (5 of 5)
Posts: 0
Threads: 0
Joined: Sep 2010
The next set of photographs were labeled "First vehicle fell in with no vehicles on bridge" This was likely in mid-late July, 1944. In his “History Sketch 157th Engineer © Bn.” memoir, Major, CE Harry C. Davis wrote about the bridge: “The only engineer work done so far in this move was the installation of a Bailey Bridge over a blown span of a multiple arch bridge. The bridge withstood traffic all night and collapsed the following day with no vehicle on it. Reason: No provision had been made for horizontal forces and the dead weight on the bridge caused it to collapse. A lesson was learned here that was never forgotten; an arch bridge (keystone), once the series of arches are broken, must be braced against itself to prevent its collapsing from its own weight on a horizontal movement”.
First vehicle fell in with no vehicles on bridge (1 of 4)
First vehicle fell in with no vehicles on bridge (2 of 4)
First vehicle fell in with no vehicles on bridge (3 of 4)
First vehicle fell in with no vehicles on bridge (4 of 4)
Posts: 0
Threads: 0
Joined: Sep 2010
"Highway bridge, Neufchatau, Company C" No additional information at this time.
Highway bridge, Neufchatau, Company C (photo 1 of 3)
Highway bridge, Neufchatau, Company C (photo 2 of 3)
Highway bridge, Neufchatau, Company C (photo 3 of 3)
Blown railroad bridge not reconstructed by 157th Engr Const Bn. (No additional information at this time)
Posts: 0
Threads: 0
Joined: Sep 2010
Next up "Bridge as taken over from 163rd Engineers" (No additional information at this time)
Bridge as taken over from 163rd Engineers (photo 1 of 5)
Bridge as taken over from 163rd Engineers (photo 2 of 5)
Bridge as taken over from 163rd Engineers (photo 3 of 5)
Bridge as taken over from 163rd Engineers (photo 4 of 5)
Bridge as taken over from 163rd Engineers (photo 5 of 5)
Posts: 0
Threads: 0
Joined: Sep 2010
"Rebuilding of Motor Park 11th Evacuation Hospital, Bayon". As of November 1, 1944, Company C had as one of their secondary missions - Graveling Motor Park for the 11th Evacuation Hospital near Bauon. This was ompleted by Company C on November 6, 1944.
Rebuilding of Motor Park 11th Evacuation Hospital, Bayon (photo 1 of 2)
Rebuilding of Motor Park 11th Evacuation Hospital, Bayon (photo 2 of 2)
"Lamath, Company A" Note in the first photograph, the jeep is part of the 79th Infantry Division which the 157th was with for a good while.
Lamath, Company A (Photo 1 of 3)
Lamath, Company A (Photo 2 of 3)
Lamath, Company A (Photo 3 of 3)
Posts: 0
Threads: 0
Joined: Sep 2010
"Bridge at Luneville, Company A and 163rd Engineers" (No additional information at this time)
Bridge at Luneville, Company A and 163rd Engineers (photo 1 of 8)
Bridge at Luneville, Company A and 163rd Engineers (photo 2 of 8)
Bridge at Luneville, Company A and 163rd Engineers (photo 3 of 8)
Bridge at Luneville, Company A and 163rd Engineers (photo 4 of 8)
Bridge at Luneville, Company A and 163rd Engineers (photo 5 of 8)
Bridge at Luneville, Company A and 163rd Engineers (photo 6 of 8)
Bridge at Luneville, Company A and 163rd Engineers (photo 7 of 8)
Bridge at Luneville, Company A and 163rd Engineers (photo 8 of 8)
Posts: 0
Threads: 0
Joined: Sep 2010
"Bailey installed within 4 hours of receipt of orders. Hirschland, Company C (near Sarrebourgh)" This was an 80 foot double single bailey Bridge constructed on November 29, 1944.
Bailey installed within 4 hours of receipt of orders. Hirschland, Company C (near Sarrebourgh) (Photograph 1 of 1)
At La Frohmuhl, Bitche Sector (near Rohrbach) Company B (No additional information at this time)
At La Frohmuhl, Bitche Sector (near Rohrbach) Company B (Photograph 1 of 1)
"Company C steam roller" (No additional information at this time)
Company C steam roller (photo 1 of 1)
"Hospital east of Sodd (sp.) Union" (No additional information at this time)
Hospital east of Sodd (sp.) Union (Photo 1 of 1)
Posts: 0
Threads: 0
Joined: Sep 2010
"Company C, Rahling - Bitche Section" Beginning in the morning of December 9, 1944, Company C removed one of the two treadway bridges and completed construction of the one half bridge in 7 hours (they worked on one half the bridge at a time in order to not impair the flow of heavy traffic). Removal of the second half of bridge began on December 9th and construction of the bridge was completed on the 10th.
Company C, Rahling - Bitche Section (Photo 1 of 4)
Company C, Rahling - Bitche Section (Photo 2 of 4)
Company C, Rahling - Bitche Section (Photo 3 of 4)
Company C, Rahling - Bitche Section (Photo 4 of 4)
Posts: 0
Threads: 0
Joined: Sep 2010
That was all with this installment, 25 pages worth. I was told that the book is 85 pages all together so I should be getting some more great photographs! I would welcome any information on the places, bridges, people or any other details observed on the photographs.
Posts: 0
Threads: 0
Joined: May 2012
Man, these are extraordinary pictures!!!
What great research you are doing and willing to share with us!
Do you have a summary of town/city locations where the outfit was in the War? Maybe a map?
Thank you for letting us look at these,
Jean J
|